Static Space Elevator Designer

Uniform-stress equatorial tether, loaded by a steady stream of climbers. Unit tests

Material
Climbers
Sizing
Climber mass breakdown
Physical constants
Numerics & display

Profile vs. altitude

Taper ratio
Cross-section (unstrained)
Tension (dots: climbers)
Stress
Base tension fraction

Performance vs. launch period

Maximum climber capacity
Throughput (at maximum capacity)

Performance vs. maximum power

Maximum climber capacity
Throughput (at maximum capacity)

Performance vs. maximum speed

Maximum climber capacity
Throughput (at maximum capacity)

Table vs. altitude

Table vs. launch period

Table vs. maximum power

Table vs. maximum speed